2019 BMW M4 Competition at Mercedes-Benz of Newton
https://sprintervansmercedesbenznewton.dealerleads.com/cars/Used/2019/BMW/M4/Competition/170510152019 BMW M4 Competition
Selling Price : $59,999
Vehicle Photos
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 28,140
- VIN : WBS4Y9C58KAG67106
- Stock # : 54118
- Engine :
- Transmission : 6-Speed Manual
- Ext. Color : Blue
- Int. Color : Sakhir Orange/Black
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : RWD
City MPG *
18
Hwy MPG *
25
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Navigation System
- 16 Speakers
- AM/FM radio: SiriusXM
- CD player
- DVD-Audio
- Hands-Free Bluetooth & USB Audio Connection
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- HD Radio
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Automatic Start/Stop Function
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Power door mirrors
- Turn signal indicator mirrors
- Advanced Real-Time Traffic Information
- Apple CarPlay
- Apple CarPlay Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Garage door transmitter
- Illuminated entry
- Leather Shift Knob
- Leather steering wheel
- Outside temperature display
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Remote Services
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Cloth/Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated Front Seats
- Heated front seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 18" x 9" Fr & 18" x 10" Rr M V-Spoke
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.


Yas Marina Blue Metallic 2019 BMW 6-Speed Manual 3.0L 6-Cylinder Turbocharged DOHC
Recent Arrival!
Awards:
* JD Power Vehicle Dependability Study (VDS)